Planning Application Submitted, new build 5-bed dwelling Barton, Preston.
Abbott Hull Associates was commissioned to undertake the initial survey and feasibility study for the redevelopment of a brownfield site on the A6. After exploring the site’s potential, Abbott Hull Associates produced several options, the client chose one design to take forward for a full planning application. The proposal will provide a detached 5- bed dwelling in a well-connected location.
The dwelling will occupy the location of a redundant BT Repeater on the A6, Barton.
Stages of work,
- Stage 1 – Feasibility Study; we have provided initial feasibility design options for our client.
- Stage 2 – Formal Planning Application; Full Planning Application submitted to Wyre Development Control.
- Stage 3 – Technical Advisor, Pre-construction information, Principal Designer.
More information to come soon.